Vipgran meeting, 5 March 2025

A meeting was held to give recent news:

  • Test of the ESA VipGran ISS instrument with EDR2 at CADMOS: March 2025,
  • Audible noise test: March 2025,
  • EQM (Engineering Qualification Model) of the instrument: Q2 2025,
  • Acceptance review (FAR): Q4 2026,
  • Launch : Q1 2027.
This entry was posted in News. Bookmark the permalink.

Leave a comment